Prevention of Stress-Induced Failures of Prestressed Concrete Crossties of the Railroad Track Structure
项目名称: Prevention of Stress-Induced Failures of Prestressed Concrete Crossties of the Railroad Track Structure
摘要: The problem the research team is trying to solve is to understand and mitigate premature failures of prestressed concrete crossties (PSCCs), which are an essential structural component of a railroad track structure. The objectives of the project are to identify the main mechanisms of horizontal cracks upon de-tensioning prestressing wires with respect to various geometrical/mechanical parameters and to develop more durable bonding mechanism between concrete and prestressing wires using engineered cementitious materials.
状态: Active
资金: 357213
资助组织: Office of the Assistant Secretary for Research and Technology
管理组织: Office of the Assistant Secretary for Research and Technology
项目负责人: Dunn, Denise E
执行机构: Western New England University
主要研究人员: Lee, ChangHoon
开始时间: 20181001
预计完成日期: 20210930
实际结束时间: 0
检索历史
应用推荐