项目名称: |
Continued Monitoring of the Varina-Enon Bridge - Estimation of Effective Prestress |
摘要: |
The Varina-Enon Bridge, which carries I-295 over the James River near Richmond, has
had a history of issues in the approach spans including: failure of two tendons due to corrosion, significant cracking, and active opening and closing of match-cast joints under high traffic loads concurrent with high positive thermal gradients. A long-term plan is necessary for monitoring the structure to ensure its continued safe transport of traffic along this important corridor. The proposed monitoring will occur over several years in order to evaluate the level of effective prestress in the external tendons and to better quantify the thermal gradient. These assessments will assist in developing accurate load ratings and in determining if, and when, additional tendons should be installed in the bridge in order to achieve a sufficient level of confidence in the capacity and long-term durability of the structure. |
状态: |
Active |
资金: |
198955 |
资助组织: |
Virginia Transportation Research Council |
管理组织: |
Virginia Transportation Research Council |
项目负责人: |
Kassner, Bernie |
执行机构: |
Virginia Polytechnic Institute and State University, Blacksburg |
主要研究人员: |
Koutromanos, Ioannis |
开始时间: |
20181001 |
预计完成日期: |
20211031 |
实际结束时间: |
0 |