Evaluation of Long-Term Impacts of Early Opening of Concrete Pavements
项目名称:
Evaluation of Long-Term Impacts of Early Opening of Concrete Pavements
摘要:
This project will help to establish a method for determining when a Portland Cement Concrete (PCC) pavement or patch can be opened earliest to traffic without compromising its long-term performance. To achieve it, the very early-age fatigue damage and associated long-term distress in PCC pavement subjected to early opening will be evaluated and monitored. This will verify early-opening methodologies recent research has proposed. The objectives of this study will be:
Evaluate visible and non-visible immediate and long-term damage caused by early age loading. To achieve it, a comprehensive analysis of sensor reading and non-destructive test results should be conducted; Quantify the effect of early loading damage on long-term performance; Determine minimum strength at opening or other measurable variables associated with this parameter; Recommend strategies for minimizing or avoiding early loading damage detrimental to long-term performance.