Cost-Efficient, TL-2 Bridge Rail for Low Volume Roads
项目名称: Cost-Efficient, TL-2 Bridge Rail for Low Volume Roads
摘要: In 2016, the Nebraska State Legislature passed bill LB960 to adopt the Transportation Innovation Act. A portion of this act created a voluntary county bridge match assistance program intended to aid Nebraska counties in replacing deteriorated bridges. This program was targeted for the numerous bridges located on rural, low-volume roadways that need immediate attention. With the replacement of these bridges, new bridge rails and approach guardrail systems will also be necessary to provide safety to the motoring public. Due to the large number of deficient bridges slated for replacement, these new bridges need to be constructed in a timely and cost-efficient manner. As such, the associated bridge railings should be optimized to minimize costs while satisfying current safety standards. The bridge rail should be mounted to the side of the bridge deck in order to maximize the traversable width of the bridge, and the railing should prevent damage to deck. For convenience, one bridge rail design is desired to treat all of the future installation sites for these rural bridges. Due to the low traffic volume associated with these bridges (50 � 500 average daily traffic [ADT]), a bridge railing that satisfies the Test Level 2 (TL-2) performance criteria of the Manual for Assessing Safety Hardware (MASH) is warrant rather than using more expensive TL-3 systems typically used on higher-speed, higher-volume roadways. Thus, a new TL-2 bridge rail is desired to provide an economical treatment for rural, low volume roads. The research objectives for this project include the development and full-scale crash testing of a TL-2 bridge railing for use on rural, low-volume roadways. The bridge railing shall utilize side-mounted, weak steel posts in order to limit encroachment of the system over the bridge deck. Additionally, the bridge railing shall limit damage to the bridge deck during impact events. A detailed analysis of the required length of need will be performed to identify the minimum length of the guardrail adjacent to the bridge and limit the total installation costs. All crash testing will be conducted and reported according to the TL-2 safety requirements found in MASH.
状态: Active
资金: 164088
资助组织: Nebraska Department of Roads
执行机构: University of Nebraska, Lincoln
主要研究人员: Bielenberg, Robert W
开始时间: 20170209
预计完成日期: 20200831
实际结束时间: 0
检索历史
应用推荐