摘要: |
The US Department of Energy (DOE) is preparing to perform significant remediation activities of the sites for which it is responsible. To accomplish this, it is preparing a corporate global plan focused on activities over the next decade. Significant in these planned activities is the transportation of the waste arising from the remediation. The costs of this transportation are expected to be large. To support the initial assessment of the plan, a cost estimating model was developed, peer-reviewed against other available packaging and transportation cost data, and applied to a significant number of shipping campaigns of radioactive waste. This cost estimating model, known as the Ten-year Plan Transportation Cost Model (TEPTRAM), can be used to model radioactive material shipments between DOE sites or from DOE sites to non-DOE destinations. The model considers the costs for (a) recovering and processing of the wastes, (b)packaging the wastes for transport, and (c) the carriage of the waste. It also provides a rough order of magnitude estimate of labor costs associated with preparing and undertaking the shipments. At the user`s direction, the model can also consider the cost of DOE`s interactions with its external stakeholders (e.g., state and local governments and tribal entities) and the cost associated with tracking and communicating with the shipments. By considering all of these sources of costs, it provides a mechanism for assessing and comparing the costs of various waste processing and shipping campaign alternatives to help guide decision-making. Recent analyses of specific planned shipments of transuranic (TRU) waste which consider alternative packaging options are described. These analyses show that options are available for significantly reducing total costs while still satisfying regulatory requirements. |