题名: | Reduced temperature asphalt |
正文语种: | eng |
摘要: | Because the surfacing work was being carried out in a road tunnel, the contractor had to minimise emissions from the asphalt. It was decided that the reduced temperature material would meet the necessary specifications for the road project, while also hel |
出版年: | 2021 |
期刊名称: | World highways |
卷: | 30 |
期: | 12 |
页码: | 27-28 |