原文传递 Strategic Plan for the Electronic Toll Collection System: FasTrak on the San Francisco Bay Area State-Owned Toll Bridges. Executive Summary.
题名: Strategic Plan for the Electronic Toll Collection System: FasTrak on the San Francisco Bay Area State-Owned Toll Bridges. Executive Summary.
关键词: TOLL ROADS; TRAFFIC MANAGEMENT; TRAFFIC SIMULATION; TRANSPORTATION
摘要: This report summarizes the findings and recommendations of the utilization and operational analysis of the electronic toll collection (ETC) FasTrak - system on the seven state-owned bridges in the Bay Area. At present, there are a total of 68 toll lanes (3 of these lanes are HOV bypass that currently have no toll collection functionality) on the seven state-owned toll bridges in the Bay Area. As of November 2000, all lanes have been equipped with ETC equipment. At present, there is one lane dedicated for ETC use on each of the bridges. All other lanes are always operated in mixed mode (cash and ETC), except at the Bay, Carquinez, and San Mateo Bridges which have dedicated HOV during weekday peak periods.
报告类型: 科技报告
检索历史
应用推荐