题名: | Vicksburg District Begins Drawdown Of Thatcher Lock And Dam |
正文语种: | eng |
摘要: | The Vicksburg Engineer District began a pool drawdown at Thatcher Lock and Dam on November 19 to make repairs to the seal of the hinge crest gate. The pool at Thatcher Lock and Dam was expected to fall as much as 6 inches per day, from 77 to 72 feet. The |
出版年: | 2021 |
期刊名称: | The Waterways Jouranl |
卷: | 135 |
期: | 35 |
页码: | 17-17 |