当前位置: 首页> 国外交通期刊数据库 >详情
原文传递 Vicksburg District Begins Drawdown Of Thatcher Lock And Dam
题名: Vicksburg District Begins Drawdown Of Thatcher Lock And Dam
正文语种: eng
摘要: The Vicksburg Engineer District began a pool drawdown at Thatcher Lock and Dam on November 19 to make repairs to the seal of the hinge crest gate. The pool at Thatcher Lock and Dam was expected to fall as much as 6 inches per day, from 77 to 72 feet. The
出版年: 2021
期刊名称: The Waterways Jouranl
卷: 135
期: 35
页码: 17-17
检索历史
应用推荐