摘要: |
Vehicles on the Cleveland HealthLine Bus Rapid Transit (BRT) system are equipped with a mechanical docking arm and guide wheel to assist with precision docking at the stations. This report documents the evaluation of the guide wheel in 4 areas: how close to the platform the vehicles were able to dock; how fast the vehicles were able to dock; how much money was spent on damages related to docking; and how well the guide wheels are regarded by the HealthLine drivers. The evaluation compared the performance of the HealthLine to the EmX BRT in Eugene, Oregon. The EmX uses the same model vehicle as the HealthLine but does not come equipped with a docking arm and guide wheel. |