原文传递 Determination of the Offset Distance Between Driveway Exits and Downstream U-Turn Locations for Vehicles Making Right Turns Followed by U-Turns.
题名: Determination of the Offset Distance Between Driveway Exits and Downstream U-Turn Locations for Vehicles Making Right Turns Followed by U-Turns.
作者: LIU, P.; LU, J. J.; PIRINCCIOGLU, F.
关键词: *Offset-distances; *Driveway-exits; *Median-openings; *Signalized-intersections.;U-turn-; Right-turns; 4-lane-roadways.
摘要: This study evaluated the impacts of the offset distance between driveway exits and downstream median opening or signalized intersection on the safety and operational performance of vehicles making right-turns followed by U-turns. The focus of this research was on urban or suburban multilane divided arterials.
报告类型: 科技报告
检索历史
应用推荐