摘要: |
The Kentucky Transportation Cabinet (KYTC) conducted an experimental project to investigate the use of accelerated maintenance painting on several overpass and elevated steel structures (74,000 ft) in Louisville. Accelerated maintenance painting procedures specified for this project entailed limited access for the painting contractor coupled with incentives/disincentives to complete each phase of the work involving traffic closures on the underlying roadways. The approach was coupled with the use of abrasive blasting for surface preparation and the application of a rapid-cure 2-coat paint system to facilitate the work. The project was let for $402,800. The contractor proceeded to paint 4 spans designated for convention painting (no access time limitations or incentives/disincentives). Three spans were designated for accelerated maintenance paint. Those were divided into 6 control areas with between 4,000 to 6,000 square feet of steel to be painted. The contractor was allotted 9 to 12 hours to paint those areas on separate days. During the accelerated maintenance painting, the contractor experienced several time overruns and problems with blistering coatings on several spans. The latter was due to primarily to excessive coating thicknesses. A portion of the work was completed properly validating the technical approach employed. The accelerated maintenance painting portion of the work is described in detail. Recommendations are provided for implementing future accelerated maintenance painting projects. |