原文传递 Behavior of Prestressed High Performance Concrete Bridge Girders for US Highway 401 Over the Neuse River in Wake County, NC. Final rept. (July 2001 - July 2003).
题名: Behavior of Prestressed High Performance Concrete Bridge Girders for US Highway 401 Over the Neuse River in Wake County, NC. Final rept. (July 2001 - July 2003).
作者: kowalsky, m. j. zia, p. wagner, m. c. warren, b. a.
关键词: *Bridge-research-project; *Concrete-bridge-girders; *Prestressed-; *High-performance; *Neuse-River-(North-Carolina.;Instrumentation-; In-service-monitoring; Load-testing; Long-term-monitoring.
摘要: This report represents phase three of US 401 HPC Bridge research project. It includes a full description of the bridge instrumentation for the purposes of in-service monitoring, controlled load testing and long-term monitoring. Effects due to thermal and traffic loading, over a period of four months, are reported. Strains and deflection due to controlled load testing are also reported, with comprehensive analysis of the results.
报告类型: 科技报告
检索历史
应用推荐