项目名称: |
ABC Deck Connections, Laboratory Testing and Evaluation |
摘要: |
This project is examining new connections between pre-cast bridge deck plates. In accelerated bridge construction off site pre-cast deck panels are often used. Once placed on the bridge girders, these deck panels must be tied together. This research is examining improved connections to ensure proper performance of these panel connections. |
状态: |
Active |
资金: |
117545.00 |
资助组织: |
Utah Department of Transportation |
项目负责人: |
Hsiao, Daniel |
执行机构: |
Utah State University Transportation Center |
开始时间: |
20080101 |
实际结束时间: |
20101231 |
主题领域: |
Bridges and other structures;Construction;Design;Highways;Transportation (General) |