题名: |
Study on Settlement of Railway Embankment on Deep Completely Decomposed Granite Ground with Centrifugal Model Tests |
正文语种: |
中文 |
作者: |
Hongbing XIAO Guanlu JIANG Jingzhi WANG Anhong LI |
作者单位: |
School of ivit Southwest Jiaotong Universsity, hengdu 610031,Sichuan, hina hina Railway Eryuan Engineering Group o.Ltd, hengdu 610031,Sichuan, hina |
关键词: |
embankment centrifuge model test settlement completely decomposed granite |
摘要: |
The settlement control of high-speed railway is a key technology of the embankment engineering.In allusion to the engineering characteristic of deep completely decomposed granite ground in east surround passenger railway of Hainan,based on a set of centrifuge model tests,studied the embankment settlements of ground untreated,dynamic compaction and reinforced by cement-mixed pile,reached the relationship between settlement and time,including settlement during and post-construction.It was indicated that:Weibull model can describe the relationship between embankment settlement and time.The settlements are to meet the requirements of code. |
会议日期: |
20091128 |
会议举办地点: |
成都 |
会议名称: |
高速铁路、线路工程设计理论、施工及养护技术国际学术会议 |
出版日期: |
2009-11-28 |
母体文献: |
高速铁路、线路工程设计理论、施工及养护技术国际学术会议论文集 |