摘要: |
A large number of real-time data were acquired by high-precision electric-levelmeters which were laid inside M8 Line of Shanghai Metro,when the slurry-shield passed beneath the M8 Line which was situated in an impermeable layer for the Xizang road tunnel project.The settlement's fluctuation which was dependent on the cycle of boring and standstill of shield machine was clearly observed,thus the rule of pore pressures increasing during boring and dissipating during standstill was proved in practice.The article sums up the excavating parameters when the shield crossed the M8 line.Furthermore,seepage and structural coupling numerical simulation method was also applied. |