题名: |
Time-dependent 3D Numerical Analysis of the Soil Deformation Disturbed by Super-diameter EPB Shield Tunneling |
正文语种: |
中文 |
作者: |
Hou Yongmao Zheng Yifeng Gu Chenying |
作者单位: |
ivil Engineering epartment,Shanghai Jiaotong University,Shanghai 200030,P.R. hina;Shanghai Tunnel Engineering o.,Ltd. Shanghai 200082,P.R. hina Shanghai Tunnel Engineering o.,Ltd. Shanghai 200082,P.R. hina |
关键词: |
EPB shield tunneling numerical analysis time-dependent |
摘要: |
A time-dependent 3D finite element model of the super-diameter EPB shield tunneling in soft, water saturated soil is presented.The computed effective stress and excess pore pressures in the soil around tunnel and the predicted soil deformations are studied in detail.Parametric analysis is executed to investigate the effect of the segment assembling time and longer shield machine stops on the soil behavior in the vicinity of the tunnel. |
会议日期: |
201111 |
会议举办地点: |
上海 |
会议名称: |
第五届中国国际隧道工程研讨会 |
出版日期: |
2011-10-31 |
母体文献: |
第五届中国国际隧道工程研讨会论文集 |