当前位置: 首页> 交通会议论文数据库 >详情
原文传递 NUMERICAL ANALYSIS OFFREEZING REINFORCEMENT METHODS OF LARGE-DIAMETER SLURRY SHIELD LAUCHING IN SANDY STRATA
题名: NUMERICAL ANALYSIS OFFREEZING REINFORCEMENT METHODS OF LARGE-DIAMETER SLURRY SHIELD LAUCHING IN SANDY STRATA
正文语种: 中文
作者: AI Cong HE Chuan WANG Yao FENG Kun ZHANG Zhibo
作者单位: epartment of Underground Engineering, Southwest Jiaotong University, hengdu, Sichuan 610031, hina hina Railway 14th onstruction Bureau o.Ltd, Jinan, Shandong 250014, hina
关键词: sandy strata slurry shield freezing reinforcement methods shield launching numerical analysis
摘要:   The shield tunnel of Nanjing subway line 10 is with two-tracks and is constructed by large diameter slurry balance shield.The section of shield tunneling is in sandy strata of high water pressure.In order to ensure the smooth shield construction, the following methods are used for ground consolidation in the intermediate air shaft: tri-axial deep stirring pile method + high pressure jet grouting pile method + vertical freezing method.According to numerical simulation of ANSYS, when the time of active freezing reaches 7 days, most of the adjacent freezing pipes have been circle-crossing.When the freezing time reaches 30 days, the effective thickness of the freezing wall is 2.2 r.In order to ensure the effect of freezing, the layout of the freezing pipe should be slightly larger than the effective freezing range.This article simulates the whole process of shield tunneling by numerical simulation, including removal of the temporary wall, shield tunneling and so on.The calculation results indicate that the ground consolidation has achieved good results.
会议日期: 20150909
会议举办地点: 南京
会议名称: 第八届中日盾构隧道技术交流会
出版日期: 2015-09-09
母体文献: 第八届中日盾构隧道技术交流会论文集
检索历史
应用推荐