题名: |
Engineering and Installation of the Standby Ship Mooring System |
正文语种: |
中文 |
作者: |
Liu Xueyi Tian ing Lǚ Shiji Yu Changbao Yang Hongsuo |
作者单位: |
hina Offshore Oil Engineering ompany, Tianjin, hina |
关键词: |
standby ship mooring system MOSES mooring force calculation offshore installation |
摘要: |
Due to so many subsea pipelines and cables within the offshore oilfield, standby ship mooring to a self-dropped anchor during idle time brings a potential safety threat to the subsea pipelines.Otherwise, the standby ship drifting during idle time consumes large amounts of fuel oils, which raises the expense of the oil production.So a mooring system installed to moor idle standby ships is an economic and safe solution.Taking an oilfield in Bohai Bay for example, this paper detailedly presents the method of engineering and installation of standby ship mooring system, which will provide good references for the similar project. |
会议日期: |
201409 |
会议举办地点: |
北京 |
会议名称: |
2014中国国际潜水、救捞与海洋工程技术论坛 |
出版日期: |
2014-08-31 |
母体文献: |
2014中国国际潜水、救捞与海洋工程技术论坛论文集 |