项目名称: |
Proactive Ramp Management Under the Threat of Freeway-Flow Breakdown |
摘要: |
The objectives of this research are to (1) obtain distributions of the probability of flow breakdown as a function of short-term demand for as many general types of sections and specific sections as possible reflecting the expected range of geometric and traffic conditions and (2) develop procedures that use these probability distributions to develop optimal metering rates for any given system objectives and constraints (e.g., to maximize system throughput). |
状态: |
Completed |
资金: |
400000.00 |
资助组织: |
Federal Highway Administration<==>American Association of State Highway & Transportation Officials (AASHTO)<==>National Cooperative Highway Research Program |
项目负责人: |
Derr, B Ray |
执行机构: |
University of Florida, Gainesville |
开始时间: |
20061019 |
实际结束时间: |
20091218 |
主题领域: |
Highways;Operations and Traffic Management |