Power Generation during Loading and Unloading
项目名称: Power Generation during Loading and Unloading
摘要: Until now power interfaces between carriers and terminals have had limited capabilities (less than 1 MW), they do not meet liquefied natural gas (LNG) or crude carriers safety requirements, and operate at a low voltage (440 volts). Furthermore they involve risky manual handling of heavy cables by the crew. There is an emerging requirement to allow a higher power exchange between carriers and terminals in order to: (1) reduce local harbor emissions by supplying the carriers from the shore via onshore RES (renewable energy sources) (wind-powered) when available; and (2) use the carrier's onboard power generation capability as a 'shadow' power source to meet power consumption demands if RES are not available. The PLUG project aims at developing a 'hands off ' concept were a single crew member can perform the connection/disconnection task without directly handling the power connector and the power cables. It also features the quick emergency safe disconnection capability required for LNG and crude carriers. In addition, PLUG addresses the development of operational crew and terminal procedures and of data exchange systems between all the stakeholders (charter companies, crews, ship owners, customs, terminal operators, power traders, power networks, power consumers or providers, etc.) in order to allow an easy and user-friendly power exchange operation without impairing cargo handling systems.
状态: Active
资金: 0.00
资助组织: Global Change and Ecosystems
项目负责人: Feger, Damien
开始时间: 20061000
实际结束时间: 20090400
主题领域: Marine Transportation;Terminals and Facilities;I15: Environment
检索历史
应用推荐