项目名称: |
Evaluation of Warm Mix Asphalt (WMA) Pavement |
摘要: |
This experimental features project originally consisted of three different WMA projects throughout the state. The project was revised to include only the I 15 project. The Monida-Lima (SB), I 15 project consisted of placing three types of warm mix asphalts with different technologies (Evotherm, Sasobit, and foaming) and a hot mix asphalt control section. Each section of the different technologies is approximately a quarter of the project length. The beginning and ending point of each section and the product used will be clearly defined. The objective of this research project is to determine the effectiveness of Warm Mix Asphalt (WMA) using three WMA additives and technologies compared to MDT's standard Hot Mix Asphalt (HMA) surfacing. |
状态: |
Completed |
资金: |
0.00 |
资助组织: |
Federal Highway Administration<==>Montana Department of Transportation |
项目负责人: |
Christensen, Kris |
执行机构: |
Montana Department of Transportation |
开始时间: |
20131013 |
主题领域: |
Highways;Pavements;I30: Materials |