原文传递 OPTIMIZATION OF CONSTRUCTION EQUIPMENT FOR INFRASTRUCTURE PROJECTS THROUGH EFFECTIVE PROJECT MANAGEMENT TOOLS
题名: OPTIMIZATION OF CONSTRUCTION EQUIPMENT FOR INFRASTRUCTURE PROJECTS THROUGH EFFECTIVE PROJECT MANAGEMENT TOOLS
正文语种: 英文
作者: PROF. AMIT SHRIWAS; DR. INDRASEN SINGH; PROF. SIDDESH PAI
作者单位: National Institute of construction Management and Research, Farmagudi, Ponda Goa
关键词: optimization;structure;project;development;operation;benchmarking;prediction;management;international;install
摘要: India is presently the world's fastest-growing major economy. India's economy is set to overtake the United States as the world's second largest by 2050. Infrastructure development will play vital role to convert this prediction into realty. Government of India has set the ambitious target of Infrastructure development in coming years. It is the time for Indian construction industry to make a vision to play key role in achieving such ambitious target. Indian construction have to start implementing best project management practices benchmarking international standards. As per various research, cost towards construction equipment operation is 36% of total project cost. Optimization of construction equipment will play very important role saving substantial cost of infrastructure project. Pilot study carried on Project A: NH 4A (NH 748) Four Lanning and Project B: NH 17 (NH 66) Canacona Bypass in the state of Goa. Both the project consist of bridge, culvert and road works. Total cost of the Project A is Rs. 241 Crore and cost towards construction equipment installation and operation is Rs. 92 Crore. Total cost of the Project B is Rs. 180 Crore and cost towards construction equipment installation and operation is Rs. 63 Crore. Construction equipment optimization by sharing of construction equipment between two infrastructure projects on the basis of free float utilization resulting in cost saving of Rs. 46.2 Crore.
出版年: 2019
期刊名称: Indian Highways
卷: 47
期: 6
页码: 31-41