Steel Bridge 100-Year Coating Study: Phase 1
项目名称: Steel Bridge 100-Year Coating Study: Phase 1
摘要: This project will evaluate existing polymeric and metallic coating materials, which have demonstrated possibilities of providing 100-year, maintenance-free, service life on steel bridges.
状态: Active
资金: 0.00
资助组织: Federal Highway Administration
项目负责人: Lee, Seung-Kyoung
开始时间: 20090120
实际结束时间: 20090930
主题领域: Bridges and other structures;Highways
检索历史
应用推荐