题名: |
Analysis of Corridor Delay Under SCATS Control. FAST-TRAC Phase III Deliverable. No. 10: Final Report on Analysis of Corridor Delay under SCATS Adaptive Control System (Orchard Lake Road Corridor) |
作者: |
Taylor, W. C.; Abdel-Rahim, A. S. |
关键词: |
Travel time; Corridors; Area traffic control; Traffic control optimization; Traffic control devices; Traffic control; Signal effectiveness; Traffic delay; Traffic flow; Intersections; Field tests |
摘要: |
The study was designed to determine the change in travel time following the implementation of the Sydney Coordinated Adaptive Traffic System (SCATS) in Oakland County, Michigan. A before/after comparison was used to examine the change in travel time on a specific corridor (Orchard Lake Road). The results of the study showed that corridor travel-time and intersection delay for the main street through traffic improved as a result of SCATS implementation. The corridor travel-time improved for both directions for both the peak and the non-peak periods. The reduction in corridor travel time ranged from 6.56% to 31.80%, with savings in travel time being higher during the non-peak periods. |
总页数: |
120p |
报告类型: |
科技报告 |