MEASUREMENT STUDY TO PRODUCE A TUNNEL
项目名称: MEASUREMENT STUDY TO PRODUCE A TUNNEL
摘要: THE HORIZONTAL DRILLING METHOD DEVELOPED BY THE POLYTECHNIC INSTITUTE IS TO BE SUBJECTED TO A LARGE SCALE PRACTICAL TEST. PART OF THE MANUFACTURE OF A MAIN COLLECTING DRAIN FOR THE TOWN OF DUSSELDORF CONSISTS OF A SECTION ABOUT 120 M LONG, ROUGHLY 40 M OF WHICH ARE IN A ROAD AREA WHERE SOIL FREEZING IS BEING CARRIED OUT. THE DEMONSTRATION IS TO CHECK THE FUNCTIONING OF THE HORIZONTAL DRILLING. SIMULTANEOUSLY NEW INFORMATION IS TO BE OBTAINED ON THE SOIL FREEZING OF LONG TUNNEL TUBES IN AREAS OF GROUND WATER.
状态: Active
资助组织: BUNDESMINISTER FUER FORSCHUNG UND TECHNOLOGIE
项目负责人: -
执行机构: INTERFELS, INTERNATIONALE VERSUCHSANSTALT FUER FELS GMBH<==>TECHNISCHE UNIV. BRAUNSCHWEIG, LEHRSTUHL FUER GRUNDBAU UND BODENMECHANIK<==>POLYTECHNISCHES INST. DR.-ING. WOLFGANG STAENDER<==>PHILIPP HOLZMANN AG
开始时间: 19770214
预计完成日期: 19770730
主题领域: Bridges and other structures;Geotechnology;Research;I25: Design of Tunnels;I54: Construction of Tunnels
检索历史
应用推荐