F�rb�ttrad tomfl�desallokering i Samgods med h�nsyn till angiven kapacitet - f�rstudie
项目名称: F�rb�ttrad tomfl�desallokering i Samgods med h�nsyn till angiven kapacitet - f�rstudie
摘要: The purpose of the project is analyze the modelling of empty trains in Samgods and their impact on Samgods. It is a prestudy, that may be followed by implementation of an alternative method in a follow up project. Below we present in short aspects to study for empty train handling in general, and for Samgods in particular. 1. Samgods background. Standard logistics model and rail capacity management; 2. Short literature review (update of a Ph D thesis on the subject); 3. To describe how the empty train handling in done in practice; 4. Analysis of available statistics on empty train flows; 5. To compare current method in Samgods with fixed add-on fractions for empties compared to empty flows in practice (provided they can be identified). Would a method for balancing net train flows at all terminals provide a better description?; 6. Of interest is also the train formation principles for loaded trains. What distinguishes combi train, system train and wagon load train transports from one another?; 7. Suggest a method and model for a better handling of empty trains in Samgods; 8. Analyse the impact empty trains should have in Samgods.
资金: 0.00
资助组织: Trafikverket, Sweden
项目负责人: Edwards, Henrik
执行机构: Sweco Transportsystem AB
开始时间: 20161010
预计完成日期: 20170601
实际结束时间: 0
检索历史
应用推荐