Reusable Instrumented Test Pile Phase 2 (subcontracting with Great West Drilling)
项目名称: Reusable Instrumented Test Pile Phase 2 (subcontracting with Great West Drilling)
摘要: The Task is a sole source service contract with Great West Drilling to support the Reusable Test Pile (RTP) project (Task 2343). By contracting for Becker Hammer services a $2.5 million capital cost for a Becker hammer rig is avoided. The rig will be used as part of the field testing program of the RTP. The RTP has been designed to be compatible with industry standard Becker pipe string. The Reusable Test Pile project is aimed at providing an economical alternative to conventional pile load tests. The RTP also provides a practical design procedure for piles and shafts in gravel and cobble soils which are very difficult to assess using conventional techniques.
状态: Active
资助组织: California Department of Transportation
项目负责人: Shantz, Tom
执行机构: Regents of the University of California, Davis
开始时间: 20130430
预计完成日期: 20170331
主题领域: Bridges and other structures;Highways;Maintenance and Preservation
检索历史
应用推荐