项目名称: |
Economic Pier-to-Pile Connections for Permanently Cased Shaft (CFST) Piles |
摘要: |
A missing piece of this new structural system is the foundation system including the direct pier-to-pile connection and the contribution of soil-structure interaction on this is an economical solution that reduces the cost of the structural foundation system. The overall goals of the proposed research are to: (1) Investigate concrete-filled steel tubes (CFST) connections and other column-to-pile connections through a literature review. (2) Select column-to-pile connections for study based on the finite element analysis (FEA) results. (3) Investigate the seismic response and resilience, including damage, of selected CFST connections using large-scale testing. (4) Develop, in collaboration with WSDOT and Caltrans as well as other interested transportation agencies, new design methods for these connections. (5) Develop a simplified nonlinear spring element to simulate the connection and pair the engineering demand parameters from the model to the damage states to provide tools for PBEE. |
状态: |
Active |
资金: |
70000 |
资助组织: |
Accelerated Bridge Construction University Transportation Center (ABC-UTC)<==>Office of the Assistant Secretary for Research and Technology |
项目负责人: |
Lehman, Dawn E |
执行机构: |
University of Washington, Seattle |
开始时间: |
20200101 |
预计完成日期: |
20210101 |
主题领域: |
Bridges and other structures;Construction;Design |