Uppdatering av f�rdplan f�r HCT
项目名称: Uppdatering av f�rdplan f�r HCT
摘要: HCT means vehicles that are longer and / or heavier than is now permitted. In 2013, it was commissioned by the Forum to develop a Roadmap for HCT Road and it had a target image until 2030. The work was done by CLOSER with the steering group that existed and still exists and controls the HCT program. It has now been 4 years since the roadmap was written, and development and technology are moving fast and there is a lot going on in other countries. It also happens a lot in neighboring areas like Platooning, Autonomous Vehicles, Digitalization and Motorways. The introduction of HCT road can also enable efficient and economically sustainable multimodal transport arrangements, which would require more focus on this area, only mentioned in 2013. More generally, an update would be a good basis for better identification of future research and demonstration needs in the area, among other things, with the aim of achieving the climate targets that exist both by 2030 and beyond.
资金: 0.00
资助组织: Trafikverket, Sweden
项目负责人: Vennersten, Sofie
执行机构: Lindholmen Science Park AB
开始时间: 20171001
预计完成日期: 20180915
实际结束时间: 0
检索历史
应用推荐