项目名称: | Diskontering av restidsnyttor, trafiks�kerhet och koldioxid |
摘要: | The objective of the project is to develop a more sofisticated method to determine combine time preferences, project risks and macroeconomic risks in long range infrastructure investments. The case study regards the project of high-speed trains between Stockholm, Gothenburg and Malmoe. The results of the study will be conclusions regarding the choice of rates of discount, their development over time, planning space and sensitivity analyses. |
资金: | 0.00 |
资助组织: | Trafikverket, Sweden |
项目负责人: | Asplund, Disa |
执行机构: | Statens v�g- och transportforskningsinstitut (VTI) |
开始时间: | 20170301 |
预计完成日期: | 20180930 |
实际结束时间: | 0 |