Brodynamik p� h�ghastighetsbanor - gr�nsv�rden f�r s�kerhet och komfort
项目名称: Brodynamik p� h�ghastighetsbanor - gr�nsv�rden f�r s�kerhet och komfort
摘要: At the dynamic verifications of railway bridges, a number of boundary conditions according to Eurocode EN 1990 must be fulfilled. Most of these are originally designed for ballasted track and its application to non-ballasted track can sometimes be questioned. The project aims to examine if the current requirements regarding dynamic response of railway bridges according to EN 1990, Section A2.4.4 are relevant to non-ballasted track.
资金: 0.00
资助组织: Trafikverket, Sweden
项目负责人: Andersson, Andr�as
执行机构: Kungliga tekniska h�gskolan
开始时间: 20160530
预计完成日期: 20180531
实际结束时间: 0
检索历史
应用推荐