Vibrationer vid h�ghastighetsj�rnv�g Del 2 - P�verkan p� grundl�ggningskonstruktioner, utveckling av ber�kningsmetodik 3D-FEM-modelleringar
项目名称: Vibrationer vid h�ghastighetsj�rnv�g Del 2 - P�verkan p� grundl�ggningskonstruktioner, utveckling av ber�kningsmetodik 3D-FEM-modelleringar
摘要: Today there are no generally accepted calculation method for the analysis of dynamic effects linked to the system with with high-speed rail on slab trac for the Swedish soil conditions. The project intends at this stage to develop a methodology of calculation of three-dimensional numerical simulations of moving train on railway embankments for high-speed rail with slab track. Two separate calculation tools are used and compared. Initial verification is done against the accepted analytical calculations.
资金: 0.00
资助组织: Trafikverket, Sweden
项目负责人: Ulker-Kaustell, Mahir
执行机构: Tyrens AB
开始时间: 20151027
预计完成日期: 20160229
实际结束时间: 0
检索历史
应用推荐