Full Depth Reclamation with Cement along Rt. 2A in Reed Plantation
项目名称: Full Depth Reclamation with Cement along Rt. 2A in Reed Plantation
摘要: Due to the rising cost of virgin aggregate and asphalt products the Maine Department of Transportation (MaineDOT) utilizes a number of reconstruction and rehabilitation processes to cost effectively maintain Maine's highway system. One rehabilitation process in particular is full-depth reclamation (FDR) with cement. This process rebuilds deteriorated roadways by recycling the existing Hot Mix Asphalt (HMA). The old HMA and a portion of base material are pulverized in-place, mixed with cement and water, then shaped and compacted to produce a strong and durable stabilized base material that is sealed with a HMA surface. With the added strength of the stabilized base, thickness of the HMA surface can be reduced resulting in additional cost savings. By recycling the existing HMA materials, construction costs are reduced by 25% to 50% as compared to conventional construction methods.
状态: Completed
资金: 0.00
资助组织: Maine Department of Transportation
项目负责人: Peabody, Dale
开始时间: 20070201
实际结束时间: 20080630
主题领域: Highways;Maintenance and Preservation;Pavements
检索历史
应用推荐