Bridge Hydro-mining Thickness Measurements
项目名称: Bridge Hydro-mining Thickness Measurements
摘要: This project proposes to measure the thickness of the removed concrete material as a result of hydrodemolition (and manual removal) using before and after LIDAR measurements and adapting/developing change detection algorithms.
状态: Completed
资金: 2500.00
资助组织: Missouri University of Science & Technology, Rolla
执行机构: Missouri Department of Transportation
开始时间: 20130315
实际结束时间: 20131231
主题领域: Geotechnology;Highways;Research;I30: Materials
检索历史
应用推荐