项目名称: | Bridge Hydro-mining Thickness Measurements |
摘要: | This project proposes to measure the thickness of the removed concrete material as a result of hydrodemolition (and manual removal) using before and after LIDAR measurements and adapting/developing change detection algorithms. |
状态: | Completed |
资金: | 2500.00 |
资助组织: | Missouri University of Science & Technology, Rolla |
执行机构: | Missouri Department of Transportation |
开始时间: | 20130315 |
实际结束时间: | 20131231 |
主题领域: | Geotechnology;Highways;Research;I30: Materials |